Lahore Ring Road Project
Client: PMU (Project Management Unit), C&W (Communication & Works Department)
Consultant: Nespak
Contractors: Al Noor Builders, Makkah Construction, Yukon Builders
Duration: 2016–2017
As a trusted supply partner for the Lahore Ring Road project, we provided specialized construction chemical solutions to ensure the strength and durability of the road infrastructure works:
- Curing Compound – Ensured proper hydration and crack-free curing of concrete surfaces, minimizing shrinkage and surface defects
- Admixture – Enhanced the workability, strength, and durability of the concrete mix used across the pavement and structural works
Together, these solutions contributed to a durable, high-performance road infrastructure built to withstand heavy traffic loads and long-term environmental exposure, executed in collaboration with multiple contracting partners.
Lahore Ring Road Project – Ring Road SL-III, Lahore
Client: PMU (Project Management Unit)
Consultant: Nespak
Contractor: FWO (Pvt) Ltd
Duration: 2023–2024
For the SL-III section of the Ring Road, we supplied specialized chemical solutions to support pavement strength, curing, and waterproofing works:
- Curing Compound – Ensured proper hydration and crack-free curing of concrete surfaces
- Admixture – Enhanced workability, strength, and durability of the concrete mix
- Bitumen Coating – Applied for waterproofing and protective coating against moisture and environmental degradation


