Signal Free Corridor
Signal-Free Corridor – Defence Mor to Lalak Jan Chowk
Client: DHA (Defence Housing Authority)
Consultant: Nespak
Contractor: Maaksons Construction (Pvt) Ltd
Duration: 2016–2017
As a trusted supply partner for the Signal Free Corridor project (Defence Mor to Lalak Jan Chowk), we provided specialized construction chemical solutions to ensure structural strength and long-term durability of this key road infrastructure:
- Reckon Sealant / Joint Sealant – High-performance joint sealing and waterproofing to prevent water ingress at construction and expansion joints
- Concrete Admixture – Enhanced workability, strength development, and durability of the concrete mix used across corridor structural elements
- Curing Compound – Ensured proper hydration and crack-free curing of concrete surfaces
- Shotcrete (with Shotcrete Admixture) – Applied for structural strengthening and surface repair, with specialized additives enabling rapid setting, enhanced bond strength, and durable high-strength reinforcement
- Bitumen Coating (Pile Cap Waterproofing) – Protective bituminous coating applied to pile caps to safeguard against moisture penetration and groundwater attack
Together, these solutions contributed to a durable, high-performance road corridor built to withstand heavy traffic loads and long-term environmental exposure.

