CPEC
KAROT Hydro Power Plant
Client: WAPDA (Water and Power Development Authority)
Contractors: Sinohydro Corporation Limited, China Three Gorges South Asia Investment Limited, Karot Power Company (Pvt) Ltd
Duration: 2018–2022
As a trusted supply partner for the CPEC (China-Pakistan Economic Corridor) project, we provided specialized construction chemical solutions to ensure the structural integrity and long-term durability of critical infrastructure components:
- Epoxy Injection – Repair and sealing of structural cracks to restore load-bearing capacity and prevent further deterioration
- Coating – Protective surface coating applied to safeguard concrete and steel elements against moisture, chemical attack, and environmental degradation
- PU (Polyurethane) Injection – Waterproofing and sealing of active leakages and joints, providing flexible, long-lasting water-tight protection
- Shotcrete – Rapid, high-strength sprayed concrete application for dam, tunnel, and spillway lining and support
- Joint Sealant – High-performance sealing of construction and expansion joints to prevent water ingress and maintain structural water-tightness
- Concrete Admixture – Enhanced workability, strength development, and durability of concrete used across dam, powerhouse, and spillway structures
Together, these solutions contributed to the structural rehabilitation, waterproofing, and long-term performance of this landmark CPEC infrastructure project, executed in collaboration with leading international and national partners.




